The first step, before laying the SPC lock floor, make sure that the ground is flat, dry, and clean.
The second step is to place the SPC lock floor in the room temperature environment so that the thermal expansion and contraction rate of the floor can be adapted to the laying environment. Generally, it is best to install it after 24 hours. You can also lay a layer of moisture-proof mat before paving. Pavement should start from the corner of the wall, and generally follow the order from the inside to the outside, from left to right.
The third step is to insert the male groove of the end of the second floor into the female tongue groove of the end of the front floor at an angle of about 45°, and press it gently to make it completely fit.
In the fourth step, when paving the second row of floors, insert the male tenon of the side end into the female tenon groove of the first row of floors and press it lightly to make it fully fit; then tap the right end of the floor with a rubber hammer, Insert the male tongue on the left end of the floor into the corresponding female tongue groove.
Finally, install the skirting and closing strips. After the construction is completed, the floor can be cleaned with a semi-dry mo.
Post time: Jul-20-2022